BayArena Leverkusen
Architecture: HPP Düsseldorf
The optimisation measures mainly comprised the redesign and enlargement of the team rooms including physiotherapy and regeneration areas, the construction of a new hospitality area, the restructuring of the media facilities as well as the expansion of the spectator capacity and the associated redesign of the stadium roof.